TSMC Announces Intention to Build and Operate an Advanced Semiconductor Fab in the United States
May 15, 2020 | TSMCEstimated reading time: 2 minutes
TSMC announced on May 15, 2020 its intention to build and operate an advanced semiconductor fab in the United States with the mutual understanding and commitment to support from the U.S. federal government and the State of Arizona.
This facility, which will be built in Arizona, will utilize TSMC’s 5-nanometer technology for semiconductor wafer fabrication, have a 20,000 semiconductor wafer per month capacity, create over 1,600 high-tech professional jobs directly, and thousands of indirect jobs in the semiconductor ecosystem. Construction is planned to start in 2021 with production targeted to begin in 2024. TSMC’s total spending on this project, including capital expenditure, will be approximately US$12 billion from 2021 to 2029. This U.S. facility not only enables us to better support our customers and partners, it also gives us more opportunities to attract global talents. This project is of critical, strategic importance to a vibrant and competitive U.S. semiconductor ecosystem that enables leading U.S. companies to fabricate their cutting-edge semiconductor products within the United States and benefit from the proximity of a world-class semiconductor foundry and ecosystem.
TSMC welcomes continued strong partnership with the U.S. administration and the State of Arizona on this project. This project will require significant capital and technology investments from TSMC. The strong investment climate in the United States, and its talented workforce make this and future investments in the U.S. attractive to TSMC. U.S. adoption of forward-looking investment policies to enable a globally competitive environment for a leading edge semiconductor technology operation in the U.S. will be crucial to the success of this project. It will also give us the confidence this and other future investments by TSMC and its supply chain companies will be successful.
In the United States, TSMC currently operates WaferFab in Camas, Washington and design centers in both Austin, Texas and San Jose, California. The Arizona facility, slated to be located in the Phoenix area, would be TSMC’s second manufacturing site in the United States. Construction is planned to begin in 2021, with production targeted to start in 2024.
About TSMC
Established in 1987 and headquartered in Hsinchu Science Park, Taiwan, TSMC pioneered the pure-play foundry business model by focusing solely on manufacturing customers' products. By choosing not to design, manufacture or market any semiconductor products under its own name, the Company ensures that it never competes directly with its customers. Today, TSMC is the world's largest semiconductor foundry, manufacturing 10,761 different products using 272 distinct technologies for 499 different customers in 2019.
Editor's note: Read Arizona Governor's Official Statement for more details.
Suggested Items
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
04/26/2024 | Andy Shaughnessy, Design007 MagazineIn this week’s roundup, we have a variety of articles covering everything from design through assembly, and even box build. I’ve always wondered whether box build was all it was cracked up to be. Do customers really pick one EMS provider over another because one company offers box build? And if you’ve ever wanted to volunteer, IPC’s Thought Leaders Program is looking for a few good technologists to help them on their mission. Check out Stanton Rak’s article, which was published in the spring issue of IPC Community.
NCAB Group Posts Interim Report Q1 2024
04/26/2024 | NCAB GroupNet sales decreased by 17% to SEK 950.6 million (1,146.4). Compared with the year-earlier period, sales were affected bylower prices and continued inventory adjustments by customers. In USD, net sales decreased 17%. For comparable units, net sales decreased 24% in both SEK and USD.
KYZEN Announces Exclusive Partnership with Manufacturers’ Representative Restronics Florida
04/25/2024 | KYZEN'KYZEN, the global leader in innovative environmentally responsible cleaning chemistries, proudly announces its strategic partnership with Manufacturers’ Representative Restronics Florida. Just like KYZEN’s commitment to continuously improving precision cleaning, Restronics Florida serves as a consultative OEM sales representative organization dedicated to educating customers to enhance their processes and productivity.
Determining the Value-add of Box Build
04/24/2024 | Nolan Johnson, I-Connect007At a strategic level, adding box-building services makes sense for customer loyalty. But is it really that simple? Jon Schmitz, who manages customer engagement at RiverSide Integrated Solutions, talk about about what it really takes to be successful in offering EMS and final assembly services under the same company banner.
Fujitsu, METRON Collaborate to Drive ESG Success
04/24/2024 | JCN NewswireFujitsu Limited and METRON SAS, a French cleantech company specializing in energy management solutions for industrial decarbonization, today announced a strategic initiative to contribute to the realization of carbon neutrality in the manufacturing industry.